[Translation from Japanese to English ] Inside measurement Step measurement Depth measurement Outside measurement ...

This requests contains 240 characters and is related to the following tags: "Business" . It has been translated 2 times by the following translators : ( tatsuoishimura , verdi313 ) and was completed in 3 hours 13 minutes .

Requested by okmnjiuhb at 06 Apr 2015 at 16:34 1597 views
Time left: Finished

内側測定

段差測定

深さ測定

外側測定

バルジ形状の測定

バルジ先端外径

バルジ溝部外径

バルジツバ外径

バルジ溝幅

バルジツバ厚み

温水サイクル

エンジンの冷却水

現場の改善は、どの国どの時代でも実施されてきたが『現場で即時、お金をかけず生産性、品質を向上をさせる経営システム』に作業者の知恵を体系的に取り入れ、成果を上げたのはやはりナナが最初である。

人偏のついた自働化

ナナ生産方式の体系化

世の中、業界が変化することによって仕事の方法も 現実に合わせて対応しなければならない

対応3:暖かい地方に移動する

tatsuoishimura
Rating 52
Translation / English
- Posted at 06 Apr 2015 at 19:47
Inside measurement
Step measurement
Depth measurement
Outside measurement
Measurement of bulge shape
Bulge tip outer diameter
Bulge groove outer diameter
Bulge flange outer diameter
Bulge groove width
Bulge flange thickness
Hot water cycle
Engine cooling water
The site improvement efforts have been made in any country and times, but after all Nana was the first to produce results by introducing the wisdom of the workers systematically into "the management system which improves the productivity and quality immediately on-site without spending money."
Human automation
Systematization of Nana production method
In the world, the work method must follow the industry to cope with the reality.
Measure 3: move to warm regions
tatsuoishimura
tatsuoishimura- over 9 years ago
「the industry」は、「the industry change」と訂正いたします。
verdi313
Rating 50
Translation / English
- Posted at 06 Apr 2015 at 17:23
Interior measurement

Difference in livel measurement

Depth measurement

Exterior measurement

Measurement of the bulge shape

Bulge tip outer diameter

Bulge ditch outside diameter

Bulge brim outer diameter

Bulge ditch width

Bulge brim depht

Warm water cycle

Coolant engine

Improvement of the scene , in every country, at any time, has been implemented but the " "immediate on-site , without spending money productivity, to improve the quality management system" by incorporating the wisdom of workers systematically to raise the achievement called NANA is only at its beginning .

Automation with people

Systematization of Nana production system

In the world, if there are industry changes, method work should correspond to suit reality

interaction 3: moving to warm region
okmnjiuhb likes this translation

Client

Try “Standard Translation” for specialized translation such as business purpose.

  • We can receive files such as Word, Excel, and PowerPoint.
  • There is no maximum word limit, and we deliver translations fast.
  • Higher-skilled translators will work on your request.

Feel free to contact
anytime