従来から工程内不良として検出されていたが、自動化設備でのFPを過信し、真因究明・対策が遅れてしまった。

設備チョコ停後の復帰時に、段取りマンがコネクタを表裏逆セットし、プログラム上1台目のみFP機能が働かず流出。

原因不明のまま、目視チェック追加のみに頼り、勘違いで流出した。

FP装置等の設備を過信して、真因究明を怠っていることはありませんか?
不良対策として、安易に目視チェックのみに頼ることはないですか?

慢性不良として片付けず、原因究明・対策を愚直に行うことが大切です

yoppo1026
Rating 57
Translation / English
- Posted at 14 May 2015 at 09:31
It was detected as in-process failure from the past. However, too much trust was placed in the FP in automated equipment, and the cause investigation and taking action were delayed.

When the equipment started operating again after a moment stop, initial setup person set the connector unside down, and the FP function did not work on only the first unit in the program, and it escaped.

The worker relied on only the additional visual check with the cause remaining unclear, and let it escape by his misunderstanding.

Don't you place too much trust on the equipment such as FP device and neglect investigating the root cause?
Don't you sometimes rely on only the visual check as an action against failures?

It is important to investigate the cause and take action honestly instead of settling it as a chronic failure.
renianggraeni
Rating 50
Translation / English
- Posted at 13 May 2015 at 19:20
It had been detected from the conventional as in-process defect, is overconfidence the FP in automated equipment, root cause investigation, measures had been delayed.

At the time of return after stopping equipment chocolate, setup man is upside set the connector, outflow does not work the program on the first unit only FP function.

Cause remains unclear, and rely on visual check only add, was outflow in misunderstanding.

By overconfidence facilities FP device and the like, do not you have neglected the root cause investigation?
As bad measures, easily Is not that rely only on visual check?

Is not dismissed as chronic failure, it is important to be performed honestly investigated the causes and countermeasures
flashflash likes this translation

Client

Try “Standard Translation” for specialized translation such as business purpose.

  • We can receive files such as Word, Excel, and PowerPoint.
  • There is no maximum word limit, and we deliver translations fast.
  • Higher-skilled translators will work on your request.

Feel free to contact
anytime