工程管理明細表からの規格に対する注意事項

コイル交換時に、指差し確認にてチェックすること
メタルチェッカーにてチェックすること

全数材料を立て、目視チェックすること
先端バリ0.3㎜以下、内径バリ0.1㎜以下
必要に応じて準備する

現在加工中の切断長にプラス100mmを入力して2本切断後赤箱へ廃却すること

但し、汎用合理化用(2013年8月現在設置工場A)は、3㎜で管理

始業点検
日常保全チェックシートに基づき、フック・吊り具の状態及びホイストクレーンの動作の確認を実施する。

3_yumie7
Rating 52
Translation / English
- Posted at 22 May 2015 at 08:11
Precautions to the standard from the process control line table

Check by "pointing and calling" at the moment of changing the coil.
Check with a metal checker.

Check with eyes setting up all the materials
The terminal burr - under 0.3 mm the inside diameter burr - under 0.1mm
Prepare if necessary


Add 100mm to the currenly processing cutting length and enter. After cutting 2 pieces, discard them to the red box.

However, control with 3mm as for pieces for general use or for streamlining( As of August 2013, installed factory: A)

Pre-operation inspection
Based on daily the maintenance check sheet,verify the conditions of hooks and slings and conduct operation confirmation tests of hoist cranes.
mgbarns likes this translation
mgbarns
mgbarns- over 9 years ago
お手数おかけしました
greene
Rating 50
Translation / English
- Posted at 22 May 2015 at 08:29
Notes for standards on process management table

When replacing coils, perform finger pointing check
Check should use a metal checker

Stand all materials and perform visual check
A burr on edge should be no larger than 0.3mm, a burr on inner diameter should be no larger than 0.1mm
Make preparation per necessity

Input 100mm addition on top of the cutting length of the one under process and discard unneeded parts into the red box after cut off 2 rolls
However, the one for general purpose improvement (currently installed at factory A as of August 2013), manage at 3mm

Inspection at begging of operation
Based on daily safety check sheet, check the status of hooks and lifters, as well as the operation of hoist cranes

Client

Try “Standard Translation” for specialized translation such as business purpose.

  • We can receive files such as Word, Excel, and PowerPoint.
  • There is no maximum word limit, and we deliver translations fast.
  • Higher-skilled translators will work on your request.

Feel free to contact
anytime