Notice of Conyac Termination ( Updated on November 25)

[Translation from Japanese to English ] Press the linkage start button and immediately press the cycle stop button; t...

This requests contains 240 characters and is related to the following tags: "Business" . It has been translated 2 times by the following translators : ( commanderwhite , dienlim90 ) and was completed in 0 hours 52 minutes .

Requested by okoraoo at 20 May 2015 at 12:55 4000 views
Time left: Finished

連動起動ボタンを押して、 すぐにサイクル停止ボタンを押し、パイプガイドからパイプを取り出して初品チェックを行う。

初品のチェックが終了したら再び自動起動ボタンを押し連続運転に入る。

確認する!

設備の材質表示と現品票の材質を確認

切断寸法入力

現品票のライン区分・品番・本数・サイズ・材質・切断長・寸法、加工種類を確認しアンダーラインをひく。

寸法カウンターにしっかり設定してあるか確認する。

17ヒーター配管の注意点

異常時は即責任者又は班長に連絡して処置をすること

下限値になったら補給すること

commanderwhite
Rating 52
Translation / English
- Posted at 20 May 2015 at 13:39
Press the linkage start button and immediately press the cycle stop button; then, take a pipe out of the guide pipe and perform the first article check.

When checking the first article is complete, press the automatic start button again and enter the continuous operation mode.

Check!

Check the equipment's material quality display and the identification tag's material quality.

Fill in the cutting dimensions.

Check the identification tag's line division, the article's number, the quantity, the size, the material quality, the cutting length, the dimensions, and the kind of processing, and underline them.

Check whether the dimensions counter is securely set.

17 Important Points of Heater Plumbing

In abnormal cases, immediately contact those in charge or the group leader and deal with them.

When the lower limit is reached, replenish.
okoraoo likes this translation
★★★★★ 5.0/1
dienlim90
Rating 46
Translation / English
- Posted at 20 May 2015 at 13:46
Press the interlocking start button, Immediately press the cycle stop button, remove the pipe and do the first good check from the pipe guide.
When you are finished check of the first goods, press interlocking start button once again and enter the continuous operation.

And then, confirm!

Check the material of the marking and identification tag of equipment.

Input cutting dimension

Check the line section of identification tag, product number, number, size, lumber quality, cutting lenght, Dimensions, processing type and underline it.

And make sure it has been firmly set in the size counter.

17 notes of heater plumbing

If there are abnormality, contact the responsible person or group leader for the threatment

Once it at the lower limit, please replenish







okoraoo likes this translation

Client

Try “Standard Translation” for specialized translation such as business purpose.

  • We can receive files such as Word, Excel, and PowerPoint.
  • There is no maximum word limit, and we deliver translations fast.
  • Higher-skilled translators will work on your request.

Feel free to contact
anytime