連動起動ボタンを押して、 すぐにサイクル停止ボタンを押し、パイプガイドからパイプを取り出して初品チェックを行う。
初品のチェックが終了したら再び自動起動ボタンを押し連続運転に入る。
確認する!
設備の材質表示と現品票の材質を確認
切断寸法入力
現品票のライン区分・品番・本数・サイズ・材質・切断長・寸法、加工種類を確認しアンダーラインをひく。
寸法カウンターにしっかり設定してあるか確認する。
17ヒーター配管の注意点
異常時は即責任者又は班長に連絡して処置をすること
下限値になったら補給すること
Translation / English
- Posted at 20 May 2015 at 13:39
Press the linkage start button and immediately press the cycle stop button; then, take a pipe out of the guide pipe and perform the first article check.
When checking the first article is complete, press the automatic start button again and enter the continuous operation mode.
Check!
Check the equipment's material quality display and the identification tag's material quality.
Fill in the cutting dimensions.
Check the identification tag's line division, the article's number, the quantity, the size, the material quality, the cutting length, the dimensions, and the kind of processing, and underline them.
Check whether the dimensions counter is securely set.
17 Important Points of Heater Plumbing
In abnormal cases, immediately contact those in charge or the group leader and deal with them.
When the lower limit is reached, replenish.
okoraoo likes this translation
When checking the first article is complete, press the automatic start button again and enter the continuous operation mode.
Check!
Check the equipment's material quality display and the identification tag's material quality.
Fill in the cutting dimensions.
Check the identification tag's line division, the article's number, the quantity, the size, the material quality, the cutting length, the dimensions, and the kind of processing, and underline them.
Check whether the dimensions counter is securely set.
17 Important Points of Heater Plumbing
In abnormal cases, immediately contact those in charge or the group leader and deal with them.
When the lower limit is reached, replenish.
★★★★★ 5.0/1
Translation / English
- Posted at 20 May 2015 at 13:46
Press the interlocking start button, Immediately press the cycle stop button, remove the pipe and do the first good check from the pipe guide.
When you are finished check of the first goods, press interlocking start button once again and enter the continuous operation.
And then, confirm!
Check the material of the marking and identification tag of equipment.
Input cutting dimension
Check the line section of identification tag, product number, number, size, lumber quality, cutting lenght, Dimensions, processing type and underline it.
And make sure it has been firmly set in the size counter.
17 notes of heater plumbing
If there are abnormality, contact the responsible person or group leader for the threatment
Once it at the lower limit, please replenish
okoraoo likes this translation
When you are finished check of the first goods, press interlocking start button once again and enter the continuous operation.
And then, confirm!
Check the material of the marking and identification tag of equipment.
Input cutting dimension
Check the line section of identification tag, product number, number, size, lumber quality, cutting lenght, Dimensions, processing type and underline it.
And make sure it has been firmly set in the size counter.
17 notes of heater plumbing
If there are abnormality, contact the responsible person or group leader for the threatment
Once it at the lower limit, please replenish