一品一葉の作業要領書に置換えが必要
パッキン(146658-7720)欠品、破れ無き事
具体的
わかりやすい
計測可能
数字になっている
同意して!
達成可能な
現実的で結果志向
期限が明確
今日やるなど…
これらの作業においては、普段に比べ特にミスや失敗が発生しやすく、そこから事故や怪我といった災害につながることも多い。
そのため3Hにあたる作業を行う際は、十分注意して取り掛かる必要がある。
問題発生時には対応策をとる
正しく円滑に機能しているか確認
致命的な失敗
顧客から苦情がくる失敗
Translation / English
- Posted at 22 Apr 2015 at 17:30
We need to replace with a work manual of one-part one sheet.
There is a shortage of the Packing(146658-7720). It should be without a rip.
concrete
easy to understand
unmeasurable
We get actual numbers( get results)
Agree with me!
achievable
realistically and result thinking
A time limit is clear
You start doing that today…
When we do these works, it's especially easier to make mistakes or failures than usual, it often causes to disasters like accidents or injuries.
So, when we do works such as 3H, we have to be careful.
We work out measures when problems happen.
Check whether it works precisely and smoothly.
A fatal error
An error complained from customers
There is a shortage of the Packing(146658-7720). It should be without a rip.
concrete
easy to understand
unmeasurable
We get actual numbers( get results)
Agree with me!
achievable
realistically and result thinking
A time limit is clear
You start doing that today…
When we do these works, it's especially easier to make mistakes or failures than usual, it often causes to disasters like accidents or injuries.
So, when we do works such as 3H, we have to be careful.
We work out measures when problems happen.
Check whether it works precisely and smoothly.
A fatal error
An error complained from customers
Translation / English
- Posted at 22 Apr 2015 at 15:57
It is necessary to change the operation manual into one sheet per one product
Packing (146658-7720) is out of stock, be sure not to be broken.
concrete
easy to understand
measurable
figured
agree with me!
achievable
realistic and result-based
limit is clear
like you do it today
In these works, mistakes and failure are especially more likely to occur than usual, so many leading to the disaster such as accidents or injuries.
So in doing the 3H work, it is necessary to be careful enough.
When the emergency occur, device a countermeasure
Be sure if it works correctly with no problems nor difficulty
Critical failure
Failure which receives complains from a client
okitekureyo likes this translation
Packing (146658-7720) is out of stock, be sure not to be broken.
concrete
easy to understand
measurable
figured
agree with me!
achievable
realistic and result-based
limit is clear
like you do it today
In these works, mistakes and failure are especially more likely to occur than usual, so many leading to the disaster such as accidents or injuries.
So in doing the 3H work, it is necessary to be careful enough.
When the emergency occur, device a countermeasure
Be sure if it works correctly with no problems nor difficulty
Critical failure
Failure which receives complains from a client