1.N2 purgeは仕様書には無い、追加事項になります。
2.1のため、実施する場合は追加コスト及び納期をいただきます。
3.弊社は4月中に出荷の計画のため、4月までしか倉庫を借りていません。
N2 purgeを実施する場合、倉庫延長費用も追加で発生します。
4.保管期間が32ヶ月であれば、VpCIを1度交換することで対応が可能だと思います。
5.4での対応で良ければ、追加のVpCIの費用については検討したいと考えています。
一番の問題は3の倉庫延長費用になります。
翻訳 / 英語
- 2022/04/14 17:19:17に投稿されました
1. N2 purge is the additional item not described in the specification.
2. For the above 1, we will ask for additional cost and extended deadline.
3. As we have planned the shipment in April, we have rented the warehouse only up to April.
If you wish to implement N2 purge, you will additionally incur the fee for extending the warehouse rent.
4. If the storage period is within 32 months, then it will possibly be treated by replacing the VpCI once.
5. If the treatment in above 4 suffices, we will further consider the cost for additional VpCl.
The most difficult problem is the rent house extension cost stated in 3.
2. For the above 1, we will ask for additional cost and extended deadline.
3. As we have planned the shipment in April, we have rented the warehouse only up to April.
If you wish to implement N2 purge, you will additionally incur the fee for extending the warehouse rent.
4. If the storage period is within 32 months, then it will possibly be treated by replacing the VpCI once.
5. If the treatment in above 4 suffices, we will further consider the cost for additional VpCl.
The most difficult problem is the rent house extension cost stated in 3.
翻訳 / 英語
- 2022/04/14 17:20:45に投稿されました
1. N2 purge is an additional item, which is not included in the specifications.
2. Because of 1. above, there would be additional charge and time for delivery required, in case it is conducted.
3. Our company had leased the storage up to April, as we plan to ship the product within the month. Therefore, if N2 purge is conducted, additional cost to prolong the lease term is also required.
4. It could be adaptable if VpCl is replaced once, having 32-month storage period.
5. If 4.above is acceptable, we could consider the VpCl cost for replacing.
2. Because of 1. above, there would be additional charge and time for delivery required, in case it is conducted.
3. Our company had leased the storage up to April, as we plan to ship the product within the month. Therefore, if N2 purge is conducted, additional cost to prolong the lease term is also required.
4. It could be adaptable if VpCl is replaced once, having 32-month storage period.
5. If 4.above is acceptable, we could consider the VpCl cost for replacing.
評価
52
翻訳 / 英語
- 2022/04/14 17:03:02に投稿されました
1 N2 purge is an additional item that is not on the specification.
2 As for 1, to conduct it, please note that an additional cost along with revised delivery.
3 We only rent the warehouse until April due to the plan of shipping in April.
To conduct N2 purge is subject to the additional expense of extension of the warehouse.
4 If the length of storage is 32 months, it will be able to deal with it by changing VpCI once.
5 If you accept the handling at No.4, we would like to consider the additional expense for VpCI.
The biggest issue is No.3 at the cost of an additional extension of the warehouse.
2 As for 1, to conduct it, please note that an additional cost along with revised delivery.
3 We only rent the warehouse until April due to the plan of shipping in April.
To conduct N2 purge is subject to the additional expense of extension of the warehouse.
4 If the length of storage is 32 months, it will be able to deal with it by changing VpCI once.
5 If you accept the handling at No.4, we would like to consider the additional expense for VpCI.
The biggest issue is No.3 at the cost of an additional extension of the warehouse.
翻訳 / 英語
- 2022/04/14 17:19:10に投稿されました
1. N2 purge is an additional item that is not included in the specifications.
2.Due to the additional item as mentioned in 1, additional cost will be charged and delivery time will be extended if implemented.
3. We have rented a warehouse until April because we plan to ship in April.
If N2 purge is implemented, additional fees for extending the warehouse will be charged. 4. If the storage period is within 32 months, the VpCI can be replaced once.
5. We would be willing to consider the cost of an additional VpCI if you agree with 4.
The biggest issue will be the cost of extending the warehouse as mentioned in 3.
2.Due to the additional item as mentioned in 1, additional cost will be charged and delivery time will be extended if implemented.
3. We have rented a warehouse until April because we plan to ship in April.
If N2 purge is implemented, additional fees for extending the warehouse will be charged. 4. If the storage period is within 32 months, the VpCI can be replaced once.
5. We would be willing to consider the cost of an additional VpCI if you agree with 4.
The biggest issue will be the cost of extending the warehouse as mentioned in 3.