本日の変化点
掲示ボード
生産計画
人員計画
生産効率低下
生産量未達
組付け木型
無計画、突発休みは生産活動に支障を来たす。
残業・有休は計画的に実施され、全員が不公平感なく納得して行われている。
設備の取扱い方法の教育が関係者に実施されている。
新設・改造設備がラインに設置された時に設備屋から操作方法が教え込まれている。
設備の日常点検と定期点検が行われている。
設備の異常兆候を早めに掴み、予防保全することで突発故障を未然に防ぐ。日常点検表があり、記録されている。
定期点検の要領が決まっている。
Translation / English
- Posted at 13 Apr 2015 at 23:35
Changing point for today
Bulletin board
Production planning
Personnel planning
Decline in production efficiency
Production quantity not met
Assembly of wooden form
Unplanned, sudden holidays are hindrance to the production activities.
Overtime and paid vacation are carried out systematically for everyone, without a sense of unfairness.
Education on ways of handling equipment is implemented by authorized people.
Operation methods for new or remodelled equipment will be trained by the installer at the time of installation.
Daily inspection and regular service of equipment are to be done.
Accidents can be prevented by spotting abnormalities in equipment ahead of time and with preventive maintenance.
Daily inspection is to be recorded on a chart.
Regular service must be carried out without fail.
gramark likes this translation
Bulletin board
Production planning
Personnel planning
Decline in production efficiency
Production quantity not met
Assembly of wooden form
Unplanned, sudden holidays are hindrance to the production activities.
Overtime and paid vacation are carried out systematically for everyone, without a sense of unfairness.
Education on ways of handling equipment is implemented by authorized people.
Operation methods for new or remodelled equipment will be trained by the installer at the time of installation.
Daily inspection and regular service of equipment are to be done.
Accidents can be prevented by spotting abnormalities in equipment ahead of time and with preventive maintenance.
Daily inspection is to be recorded on a chart.
Regular service must be carried out without fail.
Translation / English
- Posted at 14 Apr 2015 at 01:13
Today's change point
Posted board
Production planning
Manpower planning
Production efficiency decreases
Production volume unachieved
Wooden assembly
Lacking a plan and unexpected holidays bring problems to the production activities.
Overtime and paid work are carried out in a planned way, and all workers understand it is not unfairness.
Training of how to use the facilities is implemented to the related parties.
When new and remodeling equipment is installed at a line, workers need to be trained how to use by the engineers who installed the equipment.
Daily inspection and periodic inspection of the equipment are implemented.
Notice abnormal signs of equipment as soon as possible, and prevent a sudden failure by preventing maintenance before happens. Prepare a daily inspection table and it is properly recorded.
Decide the way of periodic inspection.
gramark likes this translation
Posted board
Production planning
Manpower planning
Production efficiency decreases
Production volume unachieved
Wooden assembly
Lacking a plan and unexpected holidays bring problems to the production activities.
Overtime and paid work are carried out in a planned way, and all workers understand it is not unfairness.
Training of how to use the facilities is implemented to the related parties.
When new and remodeling equipment is installed at a line, workers need to be trained how to use by the engineers who installed the equipment.
Daily inspection and periodic inspection of the equipment are implemented.
Notice abnormal signs of equipment as soon as possible, and prevent a sudden failure by preventing maintenance before happens. Prepare a daily inspection table and it is properly recorded.
Decide the way of periodic inspection.
ありがとうございました