1個流し生産と後工程引き取り

ダンゴ生産
仕掛品がたくさん必要

1個流し生産と後工程引き取り

外れたかんばんで前工程へ取りに行く
引取りに行った前工程ストアで仕掛けかんばんと差し換える

後補充生産時の“かんばん”の流れ

KNで加工・組付けされる部品
現品票をQRカードに差し換え

直送品

NKから直接車両メーカへ納入される部品
QRカードを客先かんばんに差し換え
日程管理部署

現品明示票

現品に添付移動

生産実績計上用

メーカー納品用

後補充生産

出荷

A部品
自達品
内製

生産指示
自達部品用
かんばん明細リスト

z_elena_1
Rating 52
Translation / English
- Posted at 26 Apr 2015 at 22:37
"One-piece flow" production and withdrawal for subsequent process

Large lot production
Requires a lot of in-process inventory

"One-piece flow" production and withdrawal for subsequent process

Go to the previous process to take (what is necessary) by unfastened kanban (card)
Exchange for in-process kanban (card) at the store of the previous process where you sent to take something necessary

The flow of the "kanban" (cards) during the subsequent replenishment production

Parts processed - assembled at KN
Exchange identification tag for QR card

Scheduling management post

Item identification tag

Attach to the item and move

Necessary for production result input

For products delivered to the maker

Subsequent replenishment production

Shipment

Part A
Parts procured internally (by themselves)
Internal production

Production instructions
For parts procured internally (by themselves)
Detailed kanban list
tatsuoishimura
Rating 52
Translation / English
- Posted at 26 Apr 2015 at 23:15
“One-piece flow” production and pull system

"Dango" production (lot production)
A lot of half-finished products are needed

“One-piece flow” production and pull system

Go to pull it at the previous process with the detached kanban
Replace it with production instruction kanban at the previous process store one goes for pulling

Kanban flow at the time of fill-up production

Parts processed and assembled in KN
Replace client identification tag with QR card

Direct delivery products

Parts delivered to the vehicle maker directly from NK
Replace QR card with client kanban
Schedule control section

Explicit identification tag

Attach it to the products on display and move

For production result input

For delivery to the maker

Fill-up production

A parts
Parts provided by oneselves
In-house production

Production instruction
For parts provided by oneselves
Kanban spedificatin list
[deleted user]
Rating 50
Translation / English
- Posted at 07 May 2015 at 19:25
ああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああああ

Client

Try “Standard Translation” for specialized translation such as business purpose.

  • We can receive files such as Word, Excel, and PowerPoint.
  • There is no maximum word limit, and we deliver translations fast.
  • Higher-skilled translators will work on your request.

Feel free to contact
anytime