1. Remove existing Pine and use two Willows from Court 1.
2. One Willow should be adjacent to the existing pool, the other Willow being in place of the Pine.
3. The pool should be filled as soon as waterproofing measures are completed and, if possible, water lilies and/or goldfish should be added as originally planned.
4. Mr. Noguchi suggested that the waterfall be reactivated,
5. The existing curved concrete segments adjacent to the existing Pine trees should be removed, It was suggested that the concrete platform at the entrance to each Court be replaced with granite.