Notice of Conyac Termination

Translator Reviews ( Japanese → English )

Rating: 55 / Native English / 0 Reviews / 20 Nov 2016 at 18:06

kamitoki
kamitoki 55 JLPT Level 2 passer JLPT Level 1 60%...
Japanese

4. QC工程表
- 検査の全体の流れがわかるもの。(製造工程、担当部署、検査記録、検査手順書など)
- 各検査の内容がわかる資料
- その検査の合否基準
- 各検査の記録(検査を実施したことがわかるエビデンス)
- システム全体の最終的な検査成績書

提出書類の中に引用する社内規定等がある場合、文書名・文書番号を明記すること。
その文書について、文書体系を説明すること。

English

4. Quality control process table
- To understand the entire body of the inspection (manufacturing process, position in-charge, inspection records, inspection flow document)
- materials to understand the content of each inspection
- records of each inspection (evidence to understand the inspections carried out)
- the final inspection results of the entire system
Should there be company policies etc. that quotes from already submitted documents, the document name and number must be stated.
The organization system of the document must be explained.

Reviews ( 0 )

There are no translator reviews yet.
Additional info: 製造業における品質管理関係の文書です。