・AをMelting deviceに入れるときの作業手順
ヒータ付きのAは基本的にはヒータを使用して分解します。
そのときの手順は以下の通りです。
1.イン/アウトのボルトを2本ずつ残してはずす。
2本は緩めたあと、軽く当たるまで締める。
2.Aを立ててアウト側のボルトをはずす
3.ヒータで加熱する。
4.引き抜き可能まで昇温したらアウトレットカバーとバンドルをはずす。
5.ヒータをはずして、ハウジングとインレットカバーを分解する。
Rating
52
Translation / English
- Posted at 18 Apr 2018 at 08:00
- Procedure of work when putting A into Melting device
A with heater is taken apart using the heater basically.
The procedure is as follows;
1. Remove leaving two each bolt of in and out.
After loosening two, tighten until touching lightly.
2. Remove the bolt outside straightening A
3. Overheat with the heater.
4. After it is possible to pull out rising temperature, remove the outlet cover and handle.
5. Remove the heater, take apart the housing and input cover.
A with heater is taken apart using the heater basically.
The procedure is as follows;
1. Remove leaving two each bolt of in and out.
After loosening two, tighten until touching lightly.
2. Remove the bolt outside straightening A
3. Overheat with the heater.
4. After it is possible to pull out rising temperature, remove the outlet cover and handle.
5. Remove the heater, take apart the housing and input cover.
Translation / English
- Posted at 18 Apr 2018 at 07:52
Procedure when A is put into melting device
We basically disassemble A by using a heater.
The procedure is as follows.
1. Remove by leaving 2 bottles of in and out respectively.
Regarding the 2 bottles, warm them up and tighten them until they are loosely tightened.
2. By standing A, remove the bottle at out.
3. Heat by the heater.
4. After heating it to the level where drawing is possible, remove outlet cover and bundle.
5. Remove the heater, and then disassemble housing and inlet cover.
We basically disassemble A by using a heater.
The procedure is as follows.
1. Remove by leaving 2 bottles of in and out respectively.
Regarding the 2 bottles, warm them up and tighten them until they are loosely tightened.
2. By standing A, remove the bottle at out.
3. Heat by the heater.
4. After heating it to the level where drawing is possible, remove outlet cover and bundle.
5. Remove the heater, and then disassemble housing and inlet cover.
Translation / English
- Posted at 18 Apr 2018 at 07:49
・The procedure to put A into Melting device
Basically, A which comes with the heater works breaking down with the heater on.
The procedure is as follows:
1. Leave two each of In/Out bolts and unloosen.
Two bolts should be tightened until they click lightly after loosening once.
2. Erect A and unloosen the Out bolt.
3. Turn the heater on.
4. When it gets warm enough so you can remove, remove both outlet cover and the bundle.
5. Remove the heater and break down the housing and the inlet cover.
Basically, A which comes with the heater works breaking down with the heater on.
The procedure is as follows:
1. Leave two each of In/Out bolts and unloosen.
Two bolts should be tightened until they click lightly after loosening once.
2. Erect A and unloosen the Out bolt.
3. Turn the heater on.
4. When it gets warm enough so you can remove, remove both outlet cover and the bundle.
5. Remove the heater and break down the housing and the inlet cover.