Translator Reviews ( English → Japanese )

Rating: 50 / 0 Reviews / 30 Oct 2017 at 19:05

oooooohy
oooooohy 50 宜しくお願いします。
English

PACC helped to improve household water security through the installation of rainwater tanks. Education
Construction of Niue’s new primary school was completed in November 2015. The design incorporates future climate and disaster considerations, and the school is being built to withstand severe storms and will double as an evacuation centre.
Over $4.2 million was committed to the design and construction of the school. The management and oversight of the construction stage has been delegated to New Zealand.
This was the first step in Australia’s strategy to transition towards a long-term delegated cooperation arrangement with New Zealand to support the education sector, signed in June 2014.

Japanese

PACCは雨水タンクを設置し、家庭用水の安全性向上を支援しました。
教育
ニウエの新しい小学校の建設は2015年11月に完了しました。将来の気候や災害を考慮したデザインで、激しい嵐にも耐えられるよう建てられました。また避難所としての役割もはたします。
4.2百万ドル以上の資金を学校のデザインと建設に費やしました。施工段階の管理、監視はニュージーランドに委託しています。
これは、ニウエの教育部門を支援するためにニュージーランドと2014年6月に締結した、長期委託協力協定へ移行するオーストラリアが行った戦略の第一歩でした。

Reviews ( 0 )

There are no translator reviews yet.