Notice of Conyac Termination ( Updated on November 25)

Translator Reviews ( English → Japanese )

Rating: 50 / 0 Reviews / 25 Apr 2011 at 16:51

fizik
fizik 50
English

5.1 OPERATING THE CIRCUIT THE FIRST TIME:

Clamp the circuit box back together and turn the switch to the X10 scale. Make certain that the sliding beta window of the probe is closed. Wait thirty seconds for the system to reach stability. The indicator should remain substantially at zero.

Open the window on the probe and present it to the center of the calibration source whicih is a beta radiation sample. The indicator should fall between 1.5 mr/hr and 2.5 mr/hr, averaging about 2mr/hr.

5.2 CARIBRATION:

NOTE: The beta source must constitute the sole source of radiation when calibration is performed. Calibration must not be undertaken when the background is above normal or

Japanese

5.1 初回の回路操作
回路箱を後ろに留めて、スイッチをX10スケールに向けます。プローブのスライド式ベータ線検出窓が閉じているか確かめます。 システムが安定するまで30秒間待ちます。表示はおおむねゼロを保っているはずです。

プローブのウィンドウを開けて、ベータ線サンプルである校正光源の中心へ向けます。表示は1.5mr/hrから2.5mr/hrの間で、平均して約2mr/hrとなるはずです。

5.2 キャリブレーション
注:キャリブレーションが行われている時、ベータ線源は単一の放射能源となっていなければなりません。
キャリブレーションは自然放射線が通常を超えている時は行ってはいけません。

Reviews ( 0 )

There are no translator reviews yet.
Additional info: こちらは、放射線計測器(ガイガーカウンターのマニュアルです。)よろしくお願いします。