翻訳者レビュー ( 日本語 → 英語 )

評価: 52 / 1 Review / 2015/01/28 11:38:59

日本語

当社で検討した所、紹介頂いた薬剤には、Aが含まれており、Aは、B法にて毒物に指定されていることから、安全と環境の観点から、当社では配管の表面への施工は、残念ながら出来ません。
また、計測器Cを調査した所、D電位を計測して、被膜(Film)の存在を簡易的に確認するものであって、腐食発錆の有無を予見するE電位を計測するものでなく、また、このD電位とE電位との相関性も無いので、これを腐食発錆の有無を予見するクライテリアに使用することは適切でないと考えます。

英語

After our consideration, the chemical you introduced to us has A, which is specified as the poison by B law, so we cannot use it for the surface of the piping from the safety and environment standpoint.
Moreover, when we investigate with the measurement instrument C, by measuring D electrical potential, it measures the existence of Film indirectly so it is not measuring E electrical potential which predicts the starting of the corrosion and there is not correlation between electrical potential D and electrical potential E so it is not proper to use this measurement equipment for the criteria that predicts the starting of the corrosion.

レビュー ( 1 )

yakuok 60 ・日英・英日翻訳・通訳。 ・海外の国際校で教育を受け、イギリス英語・アメ...
yakuokはこの翻訳結果を"★★★★★"と評価しました 2015/01/30 01:19:04

元の翻訳
After our consideration, the chemical you introduced to us has A, which is specified as the poison by B law, so we cannot use it for the surface of the piping from the safety and environment standpoint.
Moreover, when we investigate with the measurement instrument C, by measuring D electrical potential, it measures the existence of Film indirectly so it is not measuring E electrical potential which predicts the starting of the corrosion and there is not correlation between electrical potential D and electrical potential E so it is not proper to use this measurement equipment for the criteria that predicts the starting of the corrosion.

修正後
After our consideration, the chemical you introduced to us has A, which is specified as the poison by B law, so we cannot use it for the surface of the piping from the safety and environment standpoint.
Moreover, when we examined the measurement instrument C, by measuring D electrical potential, it measures the existence of Film indirectly so it is not measuring E electrical potential which predicts the starting of the corrosion and there is not correlation between electrical potential D and electrical potential E, so it is not proper to use this measurement equipment for the criteria that predicts the starting of the corrosion.

コメントを追加